Nord Stream 2 – last welded tube – economical

The last pipe was welded for the controversial Nord Stream 2 pipeline in the Baltic Sea. It will then be lowered to the bottom of the sea in German waters, Nord Stream 2 AG announced. Then it must still be connected to the section coming from the opposite direction. Further preparations would then be made. Russian gas monopoly Gazprom is expected to start delivering gas to Germany via the new pipeline in October, initially using the line that was laid in June.

Related Articles

Back to top button